Asian Projects Company Limited

Projects

APC offers proficient services in metal scaffolding, electrical and mechanical installations, minor civil works, rigging and lifting operations, as well as grinding and welding works within the engineering sector. Our expertise ensures reliable execution of projects, guaranteeing safety, precision, and quality across a diverse range of construction and maintenance activities.

Cooling Tower 2
CLP CPPS Water Management Facilities Enhancement

Responsible for the installation of one temporary pipeline with a diameter of DN500 and another with a diameter of DN350 near No. 2 Lagoon. This includes the layout design for the new temporary pipeline.

CLP CPPS Water Management Facilities Enhancement

Provides E&M CP, lifting supervisors, riggers, and general laborers for the WMFE project.

CLP BPPS C5 Scaffold Work for North to South Pipe Bridge Refurbishment

Scaffolding Works
•Scaffold Design Drawings and Materials
•Eligible Scaffold Competent Persons
•Professional Scaffold Teams
•Lifting Operations

CLP BPPS C1 ACW Piping Refurbishment

Scaffolding Works
•Scaffold Design Drawings and Materials
•Eligible Scaffold Competent Persons

Piping Work
•Installations & Dismantlement
•Lifting Operations
•Alignments
•Painting Works

CLP B2 Electrostatic Precipitator RDE Replacement

Scaffolding Works for EP RDE  
•Scaffold Design Drawings and Materials
•Eligible Scaffold Competent Persons
•Professional Scaffold Teams

CLP C1 ACW Piping Refurbishment

Provide competent manpower such as lifting supervisors and lifting assessor to carry out lifting plan and checklist for lifting operations and the ACW piping refurbishments and replacement works.

CLP CPPS B2 Boiler Pressure Parts Refurbishment

Wai Luen Development Ltd

ACC Ash Hopper
•Inspection Doors Replacements
•Fire Clay Repairs
•Steel Plate Repairs
•Blocked Spray Nozzles Cleaning
(Welding, De-Rusting, Lifting Operation & Flame Cutting etc.)

Variety of Repair Works for Kiln Overhaul Period

Piping Works
• Installation, Dismantlement, Lifting Operation, Welding & Alignment etc.

Scaffolding Works
•Scaffold Design Drawings and Materials
•Eligible Scaffold Competent Persons
•Professional Scaffold Teams

CLP D1 Unit Cladding and Insulation Installation

•HRSG Pipes Insulations and Cladding Installations
•Gas Turbine Insulations and Cladding Installations
•Pipes Support Rings Installations

CLP CPPS A3 & A4 & B2 Unit Boiler and Ducting Refurbishment

•Provide Scaffold Drawing Designs , Eligible Scaffold Competent Persons & Scaffold Materials
•Insulation Installations and Removal
•Cladding Installations and Removal
•Expansion Joints Replacement (Welding, Lifting, Flame Cutting & De-rusting)
•FD Fan Inlet Ducting Renewal and Structural Repair
•Bottom Dead Space Piping Casing Renewal & Steel plate Refurbishment

CLP D1 Unit Electrical and Mechanical Work

•Air Duct Refurbishments
•Cable Laying Works
•AC Unit Installations
(Installation, Removal, Lifting Operation, Hot-Work etc.)

CLP D1 Unit Commissioning

Provide supervisors, fitters, riggers, general labors for D1 unit commissioning

CLP CPPS Jetty Refurbishment

Scaffolding Works
•Scaffold Design Drawings and Materials
•Eligible Scaffold Competent Persons
•Professional Scaffold Teams

CLP CPPS Dry Dust System 137 Transfer Pipework Refurbishment

Pipework Renewals
•Dry Dust System 137 Transfer Pipework renewal (Installation, Removal, Lifting Operation, Hot-Work etc.)

CLP CPPS ACP Product Silo Cleaning

Product Silo Cleaning
•Steel plate refurbishment
•Fitter Cleaning

CLP B3 Boiler CMV Inspection

•Erect Scaffold platforms
•Dismantle/ re-install the cladding and insulation
•Grinding Works

CLP B3 ACW Pump & Motor Renewal

•Auxiliary Cooling Water Pump and Motor Renewal
•ACW Unit Installation, alignment adjustment
(Installation, Removal, Lifting Operation, Hot-Work etc.)

CLP CPPS ACC ASH Hopper, Boiler Insulation and Cladding work, Steel Plate Replacement 

•Steel Plate Replacement Work
•High Temperature Painting Works
(Installation, Removal, Lifting Operation, Hot Work etc.)

CLP B3 ACC ASH Hopper Man-hole Refurbishment

•Steel Plate Replacement and Gasket renewal Work
(Installation, Removal, Lifting Operation, Hot Work etc.)

CLP B3 ACC ASH Hopper Steel Plate Replacement

•Steel Plate Replacement Work
•High Temperature Painting Works
(Installation, Removal, Lifting Operation, Hot Work etc.)

CLP B1 Unit Expansion Joint Refurbishment

•Provide Scaffold Drawing Designs, Eligible Scaffold Competent Persons & Scaffold Materials
•Insulation Installation and Removal
•Cladding Installation and Removal
•Expansion Joints(G19) Replacement (Welding, Lifting, Flame Cutting & De-rusting)

CLP B1 Unit 5A & 5B HP Heater Normal Drain to D/A Elbow Replacement 

•Provide Scaffold Drawing Designs, Eligible Scaffold Competent Persons & Scaffold Materials
•Insulation Installation and Removal
•Cladding Installation and Removal
•Pipework Replacement (Welding, Lifting, Flame Cutting & De-rusting)

CLP D1 Unit Warranty Site Work

Scaffolding Work
•Provide Mechanical Competent Persons , Confined space Competent Persons & Authorization Person, Scaffolders for D1 unit Warranty Site Works
•Erecting the scaffold platforms for the D1 HRSG Inlet Duct and Casing Hot Spot repairs
•Erecting scaffold platform for D1 SCR System Hot Flue Gas Blower replacement and System Auxiliaries installation

Insulation and Cladding Work
•HRSG SCR Pipes Insulation and Cladding Installations
•Gas Turbine Insulation and Cladding Installations
•Pipes Support Rings Installations

CLP CPPS FGD WWT Refurbishment Work

Scaffolding Work
•Erecting scaffold platforms for FGD WWT Refurbishment.

CLP Minor Civil Work

Scaffolding Work
•Erection of multi scaffold platforms for the BPPS and CPPS Refurbishment work of Steel Elements.

CLP CPPS WMFE Project Work

Scaffolding Work
•Erection the scaffold platform for the Water Management Facilities Enhancement Project Construction work.

CLP CCGT–D2 Project Foundation Work

The scope of work includes submitting an SD request for the station permit, conducting data research, disconnecting the cables, and more.

CLP CCGT–D2 Project Installation of GRP Pipes

•Lifting the GRP Pipes and erection scaffold platforms for GRP Pipe laminations

CLP Penny Bay Power Station Control Block Refurbishment

New Progress Construction Co., Ltd

Scaffolding Works
•Scaffold Design Drawings and Materials
•Eligible Scaffold Competent Persons
•Professional Scaffold Teams
•Lifting Operations

CLP CCGT–D2 Minor Civil Work

Scope of works include excavation, laying of uPVC pipe, grouting and chipping work, formwork, Hoarding installation.

CLP CCGT–D2 Turbine Scaffolding Work

The scope of work includes providing safety access, scaffold platforms, walkways, tri-frames with connectors, and other related items.

CLP CCGT–D2 Project Work

Scaffolding Work
The scope of works includes the installation the Alpha Truss for erection, inspection, modification and dismantling of scaffolding for the casing installation work.

PAB pipes Replacement Work
PAB pipes replacement work and leakage test.

Mechanical Works
•Installation of FRP supports
•Erection of fill packs
•Erection of GRP headers
•Erection of PVC pipes
•Erection of nozzles
•Erection of drift eliminators
•Installation of Fan stack and Heat exchanger.
•Installation cladding & drift eliminator
•Commissioning
•Housekeeping around gearbox and motor foundation
•Kick plate modification works on gear reducer platform
•Fixing of greasing nipple to gear box
•Inspection of drift eliminator panels
•Bottom cladding and touch up paint for trap door.

Scaffolding